Sitemap
Search
About
Kuće Beodom Logo
  • English | Srpski
  • Construction » Progression » Windows
  • Home
  • Construction
  • Legalization
  • News
  • Partners
  • Contact
  • Education

Amadeo progression - windows

  • Amadeo progression - Finition and final result Final
    result

  • Amadeo progression - Baumit facade Baumit
    facade

  • Amadeo progression - Octava roof Octava
    roof

  • Amadeo progression - windows Windows installation

  • Amadeo progression - external walls External walls

  • Amadeo progression - Underground parking Underground parking

  • Amadeo progression - Foundations Foundations

  • Amadeo progression - Preparation of the land Land preparation

12/11/2008

Amadeo (12/11/2008)

Amadeo (12/11/2008)

11/11/2008

Amadeo (11/11/2008)

Amadeo (11/11/2008)

10/11/2008

Amadeo (10/11/2008)

Amadeo (10/11/2008)

09/11/2008

Amadeo (09/11/2008)

Amadeo (09/11/2008)

08/11/2008

Amadeo (08/11/2008)

Amadeo (08/11/2008)

05/11/2008

Amadeo (05/11/2008)

Amadeo (05/11/2008)

04/11/2008

Amadeo (04/11/2008)

Amadeo (04/11/2008)


Related articles

  • Amadeo construction update: windows, roof and ramp

    Amadeo construction update: windows, roof and ramp
    05 November 2008

What's next?

  • Amadeo: Overview Overview

  • Amadeo: Floors Plan Plan

  • Amadeo: Facade views Facade

  • Amadeo: Situation of the land in Belgrade Situation

  • Amadeo: progression Progression

  • Amadeo: news News

  • Amadeo best pictures gallery Gallery

Quality

Learn more about the quality of Beodom constructions

  • Energy efficiency: excellent thermal insulation, avoidance of thermal bridges, low-e glazing with argon fill Energy efficiency

  • Using free energy from renewable sources: geothermal heat pump and thermal solar panels Renewable energy

  • Energy efficiency and use of renewable energy makes our constructions use very little primary energy Low-energy requirement

  • Monolithic wall system and durable and lightweight roofing system Construction quality

  • Rehau PE-Xa plumbing and wastewater system, Armacell pipe insulation Plumbing installation

  • Passive stack ventilation system using Schiedel elements and Duco inlet vents on the windows Natural Ventilation

  • Taking care of the sound insulation of floors, walls and pipes Sound insulation

  • Low-temperature central floor heating system from Rehau, cooling with geothermal energy, chimney system from Schiedel Heating and cooling

  • Interior, bathroom, tiles, flooring, interior doors Interior

Go back to the projects list

Amadeo

  • Overview
  • Plan
  • Facade
  • Situation
  • Progression
  • News
  • Gallery

Projects list

Amadeo

Amadeo (1st low-energy residential building in Belgrade)

Amadeo-2

Amadeo II (construction in progress)

Basilio

Basilio (planning in progress)

Quality

  • Energy efficiency: excellent thermal insulation, avoidance of thermal bridges, low-e glazing with argon fill Energy efficiency

  • Using free energy from renewable sources: geothermal heat pump and thermal solar panels Renewable energy

  • Energy efficiency and use of renewable energy makes our constructions use very little primary energy Low-energy requirement

  • Monolithic wall system and durable and lightweight roofing system Construction quality

  • Rehau PE-Xa plumbing and wastewater system, Armacell pipe insulation Plumbing installation

  • Passive stack ventilation system using Schiedel elements and Duco inlet vents on the windows Natural Ventilation

  • Taking care of the sound insulation of floors, walls and pipes Sound insulation

  • Low-temperature central floor heating system from Rehau, cooling with geothermal energy, chimney system from Schiedel Heating and cooling

  • Interior, bathroom, tiles, flooring, interior doors Interior

Sitemap | Search | About
Home | Construction | Quality | Legalization | News | Partners | Contact | Education | Media | Events

Beodom provides legalization services and makes quality, low-energy apartments in Serbia. ©Beodom, 2006-2010.

Site design and conception by 50horizons